Difference between revisions of "Power"
m (forgot title) |
(removed graph since it it epic b0rk) |
||
Line 25: | Line 25: | ||
Also see the [[sonoff]] switch page which we gradually want to introduce as remote switch when there is nobody in the space. | Also see the [[sonoff]] switch page which we gradually want to introduce as remote switch when there is nobody in the space. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
:We've encountered some problems with the circuit breakers, here a list of devices: | :We've encountered some problems with the circuit breakers, here a list of devices: |
Revision as of 22:25, 9 November 2024
This has some consequences:
For safety reasons, we are not allowed to be present in the building. Therefore, DO NOT come to ACKspace from Friday, November 15 at 07:00 until Saturday, November 16 at 00:00. The building manager will be conducting inspections.
The parking lot will be closed, so do not leave your vehicle there.
All devices/computers must be disconnected from the power grid. We need to unplug EVERYTHING, as power surges could occur during reconnection, potentially damaging equipment.
On Thursday evening, November 14, Da_Syntax and Wolkje, on behalf of the Board, will be present in our spaces to inspect and disconnect everything from the power grid and to take care of the coolers/freezers. If you’d like to help with this, please contact Wolkje, as all assistance is welcome.
Once the work is completed, Walas will send us an email confirming that the building is accessible again. Therefore, please assume that you will not be able to access ACKspace until Sunday, November 17. The Board will notify you as soon as the space is accessible again.Also see the sonoff switch page which we gradually want to introduce as remote switch when there is nobody in the space.
- We've encountered some problems with the circuit breakers, here a list of devices:
Group 'A' (currently, the 'problem' group)
- ACKade
- ACKsess
- Christmas tree
- Network information
- Space state
- Spaceview
- Telephone System
- Thomson ST2030
- VM server
- all power strips on the hACKtable
- TV
Group 'B'
- 3D printer
- BarSystem
- CNC guide
- Coffee machine
- DE-DP14112
- Mac RGB Lamp
- Network information
- SpaceWorkhorse
- Zebra LP 2824 Plus
- fridge
(add missing items to the list)
other info
- Since 13 October 2017, we have 2x16A (shared, probably upgraded from 12A)
- Since June 2017 another renter has added servers to the same groups